EO Control Systems Gamma Control Systems Sterilization
 
 

Validation - Installation Qualification (I.Q.)

Installation Qualification is performed against the System Functional Specifications and includes some of the following items:
  • Proper installation at the site in accordance with specifications, and requirements for calibration and maintenance
  • Suitability of the site for the correct operation and use of equipment
  • Input/Output checks with address locations
  • Powered diagnostic checks to verify the successful functioning of the system
.